NOTICE:
Ground works have started in the area between the beach access gate and the area leading to the beach, adjacent to the under bar balcony area.
This work will greatly improve the dinghy wash-down area, making beach access, launching, and recovery more efficient.
The work will incorporate extra dinghy wash-down points and drains with silt-traps.
The work, when completed, will speed up the launching/recovery process and eliminate the muddy mess created. This will hopefully result in less sand in our showrooms and reduce the occurance of blocked drains.
This area and the beach access gate will not be available to anyone for the duration of the groundwork operation.
Access from Parc Heli (main compound) to the beach will be via the gate next to the training rooms.
Your cooperation would be greatly appreciated.
PLAS HELI